Be the exclusive builder for 51 lot Tula Preserve subdivision. Be sold as 51 engineered shovel ready lots. Final approval of construction plans is projected to be August 13, 2024. Private sewer plant lines and town water lines are just across Adams Street and this site is approved for access to connect. Plans are in motion for the town to take over the sewer plant as a public plant in late 2025 early 2026. All 51 lots come with $1,183/lot in prepaids to the town that can be redeemed by the builder when pulling each individual home permit. Boundary survey and approved engineered construction plans to be provided by seller at closing for 51 lot Tula Preserve. Gopher tortoises have already been removed and silt fence is in place. This exceptional residential development tract will be ready to be developed into 51 lots on the day of closing. Seller financing would be considered for a full price offer with 25% down.